Commissioning building systems speaks to what is commissioning and how to do commissioning.
This commissioning systems information, is offered to help people who operate building mechanical systems. It will enable folks to evaluate system problems. These commissioning tests will be done after construction and during building systems start up.
Most of these system problems will occur at system start up for new buildings. However, when existing mechanical systems are upgraded or retrofitted commissioning is also required.
The work is usually done by a team of people who represent the many trades involved in the construction of the building. This team of people will be comprised of design representatives, construction technicians, building automation engineers and technologists, plumbers, electricians and air and water balance technicians.
The building automation people lead the commissioning team as they have the best overview and understanding of systems interaction and operation. Systems are operated at both winter and summer simulated conditions to ensure the building will not be adversely affected by changes in outdoor temperature.
At the completion of commissioning a report will be generated detailing deficiencies found and corrective action taken.
Commissioning of systems.
Building Air Systems Commissioning
Building Cooling Systems Commissioning